04 June 2009

Canberra Stadium Master Plan Option Cs2

Option Cs2 includes all the works identified in Option Cs1. In addition the roof over the East Stand would be replaced and a new roof constructed over the Southern area. The roofs would provide coverage for 80% of spectators in these stands. Overall 75% of spectators could have covered seating (with the West Stand also roofed).

Lights would be attached to the east and south roofs and all light towers would be removed.

A new front door would be provided in the East Stand for the corporate patrons.

Traffic and Transport
The traffic and transport arrangements would be the same as in Option Cs1 Development Opportunities As in Option Cs1.

Indicative Staging and Programme:
Option Cs2 would be constructed in three stages and would take approximately three years to complete. The existing field of play would be retained during construction.

Indicative Costs:
$80-120 million (includes Cs1 development)